Overview
Two new three storey Office blocks built from scratch. CFM designed and installed the Containment above the ceiling and below the raised floor, The distribution including the main section board, meters and sub mains to each floor, Power distribution throughout including power track for floor box power and data, general lighting, emergency lighting, Fire Alarm, A/C Supplies and External lighting.